Service area / activity centre

Line marking in Broadmeadows, for car parks full of first-time visitors.

A major activity centre, with civic, retail and transport functions in the same place and a substantial industrial area alongside. The marking has to be read by drivers who have never been there before, which is a harder test than it sounds.

  • Responsible authorityCity of Hume
  • Postcode3047
  • The run from EppingWest of Epping, and close enough to Somerton and Craigieburn to sequence the three together.
What the centre contains. The principal activity centre for its municipality — civic, retail and transport functions together — with established residential areas and a substantial industrial and manufacturing area.

Who is reading the marking

A car park used by strangers does not tolerate what a staff car park does.

There is a difference between a car park used by the same fifty staff every day and a car park used by several hundred strangers. The first one tolerates poor marking almost indefinitely, because its users navigate from memory and stopped reading the lines years ago. The second one does not tolerate it at all. Every driver is solving the layout for the first time, at low speed, while looking for a space and watching for pedestrians, and anything ambiguous becomes a hesitation, a wrong turn up a one-way aisle, or a conflict in an entrance.

That puts wayfinding ahead of the bays themselves in a civic or retail car park here. Aisle direction arrows, entry and exit priority, give-way markings where aisles meet, and bay numbering that lets someone describe where they are parked. Arrows are also the first thing to wear out, because unlike a bay line every single vehicle drives directly over them — so the marking that matters most to a stranger is the marking that disappears first.

The industrial side of the suburb means the same visit can take in a factory floor and a large public car park, which are different trades of the same job. The floor is marked to a traffic management plan; the car park is marked to the approved plans for the site. Both get measured, and neither gets the other one’s method.

Public and institutional landlords also want something on paper at the end, and usually need it before they can pay. The written record of the principal dimensions, the document they were taken from, and before and after photographs is handed over on completion at no charge, because it is how the work is done rather than an extra. It also answers the query that arrives two years later from somebody who was not there.

Wayfinding, wear and the record

Three things a large public car park turns on.

WHAT A STRANGER NEEDS

Direction before decoration

Arrows, give-way markings and aisle priority where aisles meet. A driver solving your layout for the first time needs to know where to go next, and needs to know it before the car behind arrives.

WHAT WEARS FIRST

The arrows, every time

Every vehicle drives directly over an arrow and only occasionally over a bay line. In a high-turnover car park the most navigationally important marking is also the shortest-lived, which is worth building into the maintenance cycle rather than discovering.

WHAT GETS HANDED OVER

The record, on completion

Principal dimensions, the source document, and photographs before and after from comparable positions. At no charge. Institutional landlords generally need it on file, and everyone benefits from it existing.

The responsible authority

Planning here sits with the City of Hume.

Broadmeadows sits in the City of Hume, which is the responsible authority for planning here and also for Somerton and Craigieburn. Clause 52.06 of the planning scheme sets the parking requirements and the council administers them, so for a Broadmeadows address those questions go to Hume.

The distinction we hold to everywhere applies here too, and in a large car park it is easy to blur. Re-marking the existing approved layout is maintenance. Re-striping a large car park at a different bay width to gain spaces is an alteration to the layout, engages the planning scheme and may require a permit — and on a car park of this size, that gain can look tempting enough to be worth saying out loud.

What is handed over at the end, and what sits outside the engagement, are both on the standards page.

What a public car park needs

Three services, chosen for drivers who do not know the layout.

  1. Arrows, numbers and stencils

    The marking a first-time visitor actually depends on, sized to the reading distance of a driver, and the first marking to wear out.

  2. Re-marking existing layouts

    Large public car parks wear unevenly — the entrance and the aisles go long before the far corners — and the whole layout has to stay consistent.

  3. Accessible bays and shared areas

    A public car park is the most visible place an accessible bay can be wrong, and the shared area is normally what has worn away rather than the bay.

Request a quotation

Large car park, first-time drivers. We will quote it in sections.

Large car parks are quoted with the sequence in them, because a civic or retail car park cannot be closed all at once and should not be quoted as though it can.