These are the questions that come up on the phone, with the answers we would give on the phone. They are written to be useful whether you hire us or somebody else — several of them are the questions worth putting to any contractor quoting your site.

  • How long does it take to mark a car park?

    It depends on the number of bays, how much of the layout is being marked and how much work the surface needs first, which is why it is quoted after the site is measured rather than before. The shape of the answer is this: most small and mid-sized car parks are a single visit, and a visit runs in a fixed order. Sweep, blow down, wash where it needs it and lightly scrape. Chalk the set-out from a measured baseline. Check it against the plan. Then mark. The preparation and the set-out normally take longer than the painting does, which surprises people. A warehouse floor, or a site where only half the area can be closed at a time, runs across more than one visit, and the quotation says how many.

  • How long before we can drive on it?

    Waterborne acrylic is touch-dry in roughly twenty to thirty minutes in suitable conditions, so an overnight car park is normally walked and driven on when you open rather than roped off for another day. Two qualifications are worth knowing. Touch-dry is not fully cured, and fresh marking does not enjoy a stationary vehicle turning its wheels on top of it, so the first hour is better driven straight over than parked on. And the phrase “suitable conditions” is doing real work in that sentence: a cold, damp or shaded surface takes longer, sometimes much longer. On an overnight job we tell you what the surface is actually doing before you open, rather than reciting the data sheet at you.

  • Do you work nights, weekends and public holidays?

    Yes, and they are ordinary working time here rather than a premium bolted onto the quotation. A car park cannot be marked while it is being used, so the real choice is between closing during trade and working while you are shut. For a retail strip, a medical centre, a childcare centre or a dealership that is the difference between losing a trading day and losing nothing. Two practical points, whoever you use. Tell the contractor at quotation stage if the site needs an induction, a key, an alarm code or a security escort, because that is what turns a booked night into a wasted one. And tell them the time of your earliest morning traffic, the first delivery or the first staff car, so the work can be sequenced to give that section the most drying time rather than the least.

  • Does the car park have to be empty?

    The area being worked on has to be clear, not the whole car park. A bay cannot be marked around a parked vehicle and fresh marking cannot be driven over, so whatever sits inside the work area has to be out of it for the agreed period. Where a site genuinely cannot clear, the job is staged: one half is closed and marked, then the other half on a second visit. Staging costs a second set-up instead of a trading day, and its honest cost is that it needs two acceptable nights rather than one. The thing that actually goes wrong is not a full car park, it is a half-empty one: vehicles that were promised to move and did not. Tell staff and tenants a week out rather than the evening before.

  • What happens if it rains on the day we are booked?

    The visit is rescheduled, at no penalty to either party, and that is written into the quotation rather than negotiated on the night. We do not paint a surface that is wet, damp, dusty, frozen or contaminated, or work outside the paint manufacturer’s stated limits for the product being applied, because paint laid on a compromised surface lets go of it, usually within a season. Two things catch people out. The rain can stop and the surface can still be out, because asphalt holds water in its texture and in the shade long after the open middle looks dry. And a clear, still winter night with no rain at all can put the surface below the limit, because a pavement radiates heat to the sky and ends up colder than the air above it. It is worth asking any contractor what happens if the surface is unsuitable on the night. A crew that is out of pocket for walking away will not walk away.

  • How long does line marking last before it needs doing again?

    Roughly two to four years, depending on traffic volume, the condition of the surface underneath, sun exposure and how much turning happens across the lines. That is a service life rather than a warranty, and there is a more useful point behind it: marking stops doing its job well before it stops being visible. The person who has to read it is sitting low in a vehicle and often looking at a mirror or a reversing camera, where a faded line is far harder to resolve than it is to someone standing over it. And where the surface underneath is failing, oily or previously sealed, marking applied over it will not reach that life no matter who applies it. That is the sort of thing that belongs in writing before the work, not in a conversation afterwards.

  • How do I tell whether our car park needs re-marking yet?

    Stand at the far end of the car park at the hour it is busiest and look along the surface rather than down at it. If you cannot read the bay lines, the arrows and the walkway from there, neither can a driver reversing a wagon with a boot full of shopping. Then check four things specifically, because they fail earlier than the bay lines and they matter more. The hatched shared area beside an accessible bay, which stops working the moment drivers start parking in it. The walkway where it crosses an aisle. The directional arrows in an aisle that was designed one-way and is now being used both ways because nobody can tell. And the busiest turning area, which always loses its marking first, because that is where the load is. That test costs nothing and it is the same one we apply before quoting.

  • Can you mark over the old lines, or do they have to come off first?

    Usually over, provided the old marking is sound and the layout is not changing. The surface is cleaned and lightly scraped, fresh paint goes on top, and the old line serves as a guide. There are two cases where that is the wrong answer. Where paint has built up in layers over many years, or where the old film is lifting or sitting on a sealed surface, new paint bonds to the failing layer rather than to the asphalt, and it fails with it. And where the layout is changing, old lines have to be removed rather than covered, because a ghost line that reappears as the cover coat wears is worse than no line at all: drivers follow it. Mechanical removal by grinding or shot blasting is a different trade with different equipment, and we say so rather than taking the job and subcontracting it without telling you.

  • Do we need a council permit to re-mark our car park?

    Re-marking the layout already approved for your site is maintenance, and it does not normally need a planning permit. Changing the layout is a different matter. Altering the extent or layout of a car park, or changing the number of spaces, engages Clause 52.06 of the planning scheme and needs plans prepared to the satisfaction of the responsible authority, which is your council, and it may require a permit. That distinction is the one owners trip over, because adding two bays by narrowing an aisle feels like maintenance and is a planning decision. Separately, anything inside a public road reserve belongs to the road authority rather than to you or to us. If you want the layout changed, get the amended plans approved first and we will mark to them.

  • Who decides where the accessible bays go?

    Not the contractor, and not the owner on the day. How many accessible spaces a site needs comes from the National Construction Code. Their dimensions, the shared area beside them, the bollard in it and the yellow delineation come from AS/NZS 2890.6. The symbol of access and the accessible path of travel come from AS 1428.1. Above all of those sits the approved plan for your site, which may lawfully differ from the standard dimensions, because Clause 52.06-9 allows the responsible authority to agree otherwise. So the position is decided by the plan and the documents it cites. What we do is measure what is there, mark to the plan, and report in writing any dimension that appears not to meet the applicable requirement. Where a bay needs to move, that is a decision for a registered building surveyor or an accredited access consultant, not for a marking contractor.

  • Can you match the existing layout exactly?

    Yes, and for a re-mark that is the default. We set out to the layout already approved for the site, we do not redesign it and we do not change the number of spaces. Matching it exactly means measuring it rather than tracing it, which is a real distinction: a worn layout has usually drifted, and bays re-marked by eye against a faded line pick the drift up and compound it. So the baseline is measured and chalked, then checked against the plan, before the machine is started. One caveat we raise rather than paint over. Where a measured dimension in the existing layout appears not to meet the applicable requirement, you are told in writing before the work starts and the decision is yours. Repeating a fault in fresh paint is still repeating it.

  • What do you need from us before you start?

    Five things, and the first two are what actually hold jobs up. The approved plans for the site, or written confirmation that the existing layout is the approved one. Clear access to the work area for the agreed period, with vehicles genuinely moved rather than promised. Any induction, permit, key, alarm code or after-hours arrangement, told to us before the scheduled date rather than discovered at the gate. Anything you know about the surface, such as a coating, a sealant, a recurring oil problem or a section that was patched, because that is what decides how long the new marking lasts. And the time of your earliest morning traffic, so the order of work can be set around it. None of that is paperwork for its own sake. Each one is something that, missing, turns one visit into two.

Still deciding

A question that is not here is still worth asking.

The site visit and the written dimensional review are provided at no charge, and the quotation comes back with the scope and the materials set out. If the answer does not suit you, there is no obligation and no follow-up.