Standards and scope
What the work is measured against, and where it stops.
Two things are written down here. The documents a set-out is marked to, in the order they govern. And the work that is not part of the engagement, stated before a job starts rather than discovered during it.
How the work is done
The method the documents formalise.
The document decides, not the memory
Work is set out against the approved plan for the site and the referenced documents, in a fixed order of precedence. Where two documents disagree, the higher one wins and the decision is recorded. Nothing is marked because it looked about right last time.
The dimension is checked before the paint
The layout is measured and chalked, and the set-out is checked against the plan before the machine is started. This is ordinary practice on a building site, where nothing is built until the set-out has been checked. It is not ordinary practice in a car park, and that is the point.
What was marked is recorded
Principal dimensions, the document they were taken from, and photographs before and after. Handed over on completion, at no charge. If a surveyor or a tenant queries the layout in two years, the answer exists on paper.
The technical basis of the work
Six documents, in this order. Where they conflict, the higher one governs.
Most contractors write “in accordance with Australian Standards” and leave it there. In Victoria that sentence is incomplete, because the planning scheme sets the standard bay dimensions and it does not always agree with AS 2890.1.
- The approved plans for the siteGoverns everything. An approved plan may lawfully differ from the standard dimensions, because Clause 52.06-9 allows the responsible authority to agree otherwise.
- Clause 52.06-9, Design standard 2, Table 2 — Victoria Planning ProvisionsDimensions of standard parking spaces and accessways in Victoria. Used in preference to AS 2890.1 for standard bays.
- AS/NZS 2890.6:2009Accessible parking spaces, shared areas, bollards, symbols and markings. Table 2 of the planning provisions expressly excludes accessible bays.
- AS 1428.1:2021The accessible path of travel and the symbol of access.
- AS/NZS 2890.1:2004General car park matters not addressed above. This is the edition cited by Clause 52.06.
- National Construction Code, Volume One, Part D4The number of accessible spaces required, and the threshold above which signage and markings apply.
The boundary of the engagement
What we do not do.
Stated before the work starts rather than discovered during it. Where a project needs any of these, you are referred to the right practitioner, or a specialist subcontractor is engaged and named in the quotation.
- Certification of compliance with the National Construction Code, the Victoria Planning Provisions or any Australian Standard.
- Access consultancy or reporting under the Disability Discrimination Act 1992 or the Premises Standards.
- Designing a car park layout or its traffic flow, or assessing parking demand.
- Any alteration to an approved layout or to the number of parking spaces on a verbal instruction.
- Thermoplastic, epoxy, cold-applied plastic, audio-tactile marking or raised pavement markers.
- Mechanical line removal by grinding or shot blasting.
- Structural pavement repair, resurfacing, sealing, drainage or civil construction.
- Work within a public road reserve, or work needing a road authority consent or a traffic management plan.
- Supply or installation of signage, speed humps or raised platforms, unless separately quoted.
Changing a layout is not the same as re-marking one
Re-marking an approved layout is maintenance. Altering the layout, or changing the number of spaces, engages Clause 52.06 of the planning scheme, needs plans prepared to the satisfaction of the responsible authority, and may require a planning permit. We will quote the marking work once you provide the revised approved plans, or written confirmation that the revised layout is approved.
What we need from you
The approved plans, or written confirmation that the existing layout is the approved one. Clear access to the work area for the agreed period, including vehicles moved. Any site induction, permit or after-hours requirement, before the scheduled date. And anything you know about the surface — a coating, a sealant, an oil problem — because it decides how long the marking lasts.
Marking is weather dependent. We do not paint a surface that is wet, damp, dusty, frozen or contaminated, or work outside the paint manufacturer’s stated limits. If conditions stop the work, the visit is rescheduled at no penalty either way.