Warehouse floor marking: what the injury data shows, and what the regulator is looking for

Forklifts injure more people at work than any other equipment, and most incidents involve pedestrians. Where marking helps, and where a painted line is not a control at all.

16 September 2026

If you run a warehouse or a factory floor in Melbourne’s north, this is the one area where the evidence is not vague, the regulator is not passive, and the consequences are not measured in insurance excess.

The Victorian numbers

WorkSafe Victoria states plainly that forklifts cause more workplace deaths and injuries than any other piece of equipment, and that more than half of forklift-related fatalities have involved pedestrians.

The claim data behind that: in 2022 WorkSafe accepted 142 claims where a forklift caused the injury. Transport, postal and warehousing produced the most claims at 45, followed by manufacturing at 35 and wholesale trade at 32. The most common single incident type was a pedestrian being struck by a forklift, at 26 accepted serious injury claims in that year alone. Over the four years to that point, eight people died in forklift incidents in Victoria.

Those industry categories are not abstract. They are the tenancies along Cooper Street, Dalton Road and the Somerton industrial estates.

The regulator’s posture

This is where the inspection campaign question has a real answer, and it is not in car parks. It is here.

WorkSafe Victoria has described a zero-tolerance approach to forklift safety. At the time of that statement it had 32 forklift-related matters under investigation and nine employers before the courts for alleged breaches of the Occupational Health and Safety Act, including a workplace manslaughter charge against a company director following a subcontractor’s death in Somerton.

WorkSafe’s stated criticism of employers is specific: too many are still failing to implement traffic management plans that separate forklifts from pedestrians using physical barriers, pedestrian exclusion zones, traffic lights and signage.

Interstate regulators are operating the same way. SafeWork NSW has run a statewide operation focused on mobile plant, fixed machinery and vehicles, citing failure to separate people and plant as a factor in fatal incidents, and has secured a substantial penalty against one company after a worker was struck by a reversing excavator.

What floor marking does, and what it does not

Here is the part that matters, and it is not a sales line. Painted lines are not a physical control. A principal inspector with SafeWork NSW has made the point directly: painted lines and temporary barriers give a visual cue for separating vehicles and pedestrians, but they provide no protection against a runaway forklift.

Take that seriously. Under the hierarchy of control, marking is an administrative control, not an engineering one. If someone sells you floor marking as a substitute for barriers, bollards or exclusion zones in a high-risk interaction area, they are selling you a liability rather than a control.

What marking does is different and still necessary:

  • It makes the traffic management plan visible on the floor. A plan in a folder controls nothing. WorkSafe requires the plan to be communicated to everyone on site, including visitors and truck drivers, and a marked walkway is how a visiting driver learns the rule in two seconds without a briefing.
  • It defines the exclusion zone that a physical barrier enforces. The two work together. Marking without barriers is weak in a high-risk zone; barriers without marking leave every ambiguous area undefined.
  • It survives an incident investigation. Afterwards, the question is what controls existed and whether they were maintained. A worn-out walkway line is documentary evidence that a control was allowed to lapse.
  • It covers the areas barriers cannot. Racking aisles, pallet drop zones, charging bays, emergency egress paths and door swings. You cannot bollard all of them.

Where marking usually fails in practice

Five patterns recur on older Melbourne floors:

  1. The walkway that stops. A pedestrian route marked in the office end of the building that simply ends at the warehouse threshold, precisely where the forklifts are.
  2. The drop zone that has migrated. Pallets are now stacked 1.5 metres from where the hatching says, because the racking was reconfigured and the floor was not.
  3. Hazard hatching worn away by the very traffic it warns about. High-traffic zones lose marking first, and those are the zones that needed it most.
  4. No marked crossing point. Pedestrians have to cross the forklift route somewhere. If you do not choose where, they will.
  5. Marking that predates the current operation. The tenant changed, the layout changed, the lines did not.

What we do

Kontur Line Marking sets out aisles, walkways, crossing points, exclusion zones and hazard delineation to the layout in your traffic management plan, working around your operation and after hours where the floor cannot be shut down during trading.

The boundary, stated as clearly as we state it everywhere else: we mark to your plan. We do not write traffic management plans, we do not conduct OHS risk assessments, and we do not certify compliance with the Occupational Health and Safety Regulations. If you do not yet have a traffic management plan, that is the first job and it is not ours. WorkSafe Victoria publishes guidance on developing one, and your OHS adviser should lead it. Once it exists, we put it on the floor accurately and record what we marked.

Sources

  1. WorkSafe Victoria, media release on forklift injuries, January 2023
  2. WorkSafe Victoria, Developing a forklift traffic management plan
  3. WorkSafe Victoria, Safety alert: workers fatally injured by forklifts
  4. SafeWork NSW, statewide operation on mobile plant, fixed machinery and vehicles
  5. Occupational Health and Safety Regulations 2017 (Vic), regulation 121

Related services: Warehouse and factory floors · Bollards

A site visit and a written dimensional review cost nothing.

We measure the layout, report the dimensions in writing, and tell you where the marking has actually failed rather than where it merely looks tired. No obligation and no follow-up.

Request a quotation