Services
New car park set-out
A bare surface measured, chalked and marked from your approved plans, from nothing.
A new set-out is a measuring job that ends in paint. The layout is established from the approved plans for the site, chalked on the surface, and checked against the plan before the machine is started. Nothing is marked because it looked about right on the last job.
For a builder finishing a fitout, marking sits on the critical path rather than at the end of it. Under the planning provisions the car park must be constructed in accordance with the approved plans before a new use commences or new buildings are occupied, so a car park that is poured but unmarked can hold up an opening.
Where the plan itself appears to conflict with the applicable dimensional requirement, we raise it in writing before starting and wait for your direction. We do not resolve a plan conflict unilaterally on site.
Included
- Set out from client-supplied approved plans
- Chalked and checked against the plan before paint
- Conflicts between plan and requirement raised in writing, not resolved on site
- Scheduled around trade sequencing and occupancy dates
Also on site
Other services
Re-marking existing layouts
Faded bays brought back to the layout already approved for the site. Maintenance, not redesign.
Accessible bays and shared areas
Yellow delineation and the symbol of access, set out to AS/NZS 2890.6 and AS 1428.1.
Arrows, numbers and stencils
Directional arrows, bay numbering, lettering and stencils, sized to the space they sit in.