Services

New car park set-out

A bare surface measured, chalked and marked from your approved plans, from nothing.

A new set-out is a measuring job that ends in paint. The layout is established from the approved plans for the site, chalked on the surface, and checked against the plan before the machine is started. Nothing is marked because it looked about right on the last job.

For a builder finishing a fitout, marking sits on the critical path rather than at the end of it. Under the planning provisions the car park must be constructed in accordance with the approved plans before a new use commences or new buildings are occupied, so a car park that is poured but unmarked can hold up an opening.

Where the plan itself appears to conflict with the applicable dimensional requirement, we raise it in writing before starting and wait for your direction. We do not resolve a plan conflict unilaterally on site.

Included

  • Set out from client-supplied approved plans
  • Chalked and checked against the plan before paint
  • Conflicts between plan and requirement raised in writing, not resolved on site
  • Scheduled around trade sequencing and occupancy dates
The limit of this service. Kontur Line Marking provides a contractor’s dimensional review against the approved plans for the site and the applicable referenced documents, including Clause 52.06-9 of the Victoria Planning Provisions and the AS 2890 series. This review is an observation of measured dimensions. It does not constitute a statutory compliance certificate, an access consultant’s report, a building surveyor’s assessment or a car park design or layout opinion, and it must not be relied upon as a substitute for any of those. Where certification is required, the client should engage a registered building surveyor or accredited access consultant. Marking is executed to the approved plans supplied by the client; Kontur Line Marking does not alter an approved layout or the number of parking spaces.

Also on site

Other services

SERVICE

Re-marking existing layouts

Faded bays brought back to the layout already approved for the site. Maintenance, not redesign.

SERVICE

Accessible bays and shared areas

Yellow delineation and the symbol of access, set out to AS/NZS 2890.6 and AS 1428.1.

SERVICE

Arrows, numbers and stencils

Directional arrows, bay numbering, lettering and stencils, sized to the space they sit in.