Where marking sits in the programme
An unmarked car park is not a finished car park.
A new set-out is a measuring job that ends in paint. There is no existing layout to follow and nothing on the ground to copy, so the layout comes off the approved plans for the site, gets chalked on the surface, and is checked against the plan before the machine is started. Nothing is marked because it looked about right on the last job, which on a bare slab is a real temptation and a real risk.
The part builders tend to discover late is where marking sits in the programme. Under the planning provisions the car park must be constructed in accordance with the approved plans before a new use commences or new buildings are occupied. A car park that is poured and kerbed but unmarked is not finished, which means marking is on the critical path rather than at the end of it, and a date that looked like a formality turns into the thing holding up an opening.
Weather is the other half of that. Marking is weather dependent — a surface that is wet, damp, dusty or outside the paint manufacturer’s stated limits does not get painted, and the honest consequence is that a single booked day with no slack in it is a gamble. On a programme with an occupancy date in it, book the marking with a few days either side of it rather than against the deadline itself.
Where the plan appears to conflict with the applicable dimensional requirement, we raise it in writing before starting and wait for your direction. That has to happen before paint on a new site, not after, because the remedy afterwards is removal — and mechanical removal by grinding or shot blasting is not something we do. A conflict found at the chalk stage costs an email. The same conflict found a week later costs a different trade.
The sequence, and why it is a sequence
The order a new set-out happens in
Five steps, in this order, every time. The order is the point: each one exists so the next one cannot go wrong quietly.
- The approved plans arrive, or written confirmation of which drawing revision governs.
- The surface is swept, blown down and washed, because a bare slab from a building site is never clean.
- The layout is measured and chalked out, with nothing committed yet.
- The chalked set-out is checked against the plan, and any conflict is raised in writing before paint.
- The marking is applied, and the principal dimensions and their source document are recorded and handed over.
The plan the council approved governs
The City of Hume approved the plan you are marking to.
Craigieburn sits in the City of Hume, which is the responsible authority for planning here, and also for Somerton and Broadmeadows. On a new site the council is already involved, because the approved plans you are marking to were approved by it.
That is why the plan governs absolutely and we do not improve on it. An approved plan may lawfully differ from the standard dimensions in Clause 52.06-9 of the planning scheme, because the clause allows the responsible authority to agree otherwise. So a dimension on your plan that does not match the standard table is not necessarily an error — it may be exactly what the council agreed to, and marking the standard dimension instead would be the mistake.
On a new build the order of precedence decides everything, and it is written out on the standards page.
What a newer site usually needs
Three services, pitched at newer stock.
New set-out from approved plans
The usual starting point on a new site. A bare surface measured, chalked and checked against the approved plans before anything is committed in paint.
Accessible bays and shared areas
On a new build the number of accessible spaces and the signage threshold are set before you start, so the bays are marked right the first time rather than corrected later.
Wheel stops
A new layout is designed around bay depth and vehicle overhang. Wheel stops positioned off the measured depth put the vehicle nose where the plan intends; placed by eye they waste the depth the layout was designed around.
Request a quotation
Book it against the programme, not against the deadline.
If there is an occupancy date on your programme, tell us what it is and book with a few days either side of it, because weather does not negotiate.