Services

Surface cleaning and preparation

Sweeping, blowing down, washing and light scraping before anything is applied.

Paint laid over dust, grit, oil or a previously sealed surface lifts within a season. This is the most common reason a car park looks poor twelve months after it was marked, and it is almost always a preparation failure rather than a paint failure.

Every job includes sweeping, blowing down, washing where the surface requires it, and light scraping of loose material. It is not itemised as an extra, because charging separately for the step that determines whether the work lasts would be charging you for the option of a worse result.

Where the substrate is failing, oily, previously sealed or heavily deteriorated, we do not warrant the service life of marking applied over it. We note the condition in writing before proceeding so that the decision is yours and it is on the record.

Included

  • Sweeping, blowing down, washing and light scraping
  • Included in the quoted price, never an add-on
  • Substrate condition noted in writing before work proceeds
  • Wash water and residue contained and removed from site
The limit of this service. Kontur Line Marking provides a contractor’s dimensional review against the approved plans for the site and the applicable referenced documents, including Clause 52.06-9 of the Victoria Planning Provisions and the AS 2890 series. This review is an observation of measured dimensions. It does not constitute a statutory compliance certificate, an access consultant’s report, a building surveyor’s assessment or a car park design or layout opinion, and it must not be relied upon as a substitute for any of those. Where certification is required, the client should engage a registered building surveyor or accredited access consultant. Marking is executed to the approved plans supplied by the client; Kontur Line Marking does not alter an approved layout or the number of parking spaces.

Also on site

Other services

SERVICE

Re-marking existing layouts

Faded bays brought back to the layout already approved for the site. Maintenance, not redesign.

SERVICE

New set-out from approved plans

A bare surface measured, chalked and marked from your approved plans, from nothing.

SERVICE

Accessible bays and shared areas

Yellow delineation and the symbol of access, set out to AS/NZS 2890.6 and AS 1428.1.