Service area / growth area
Line marking in South Morang, where the original plan can usually still be found.
A newer growth area with a town-centre retail precinct, which puts a lot of its car parks at the point where the original marking has reached the end of its service life for the first time.
- Responsible authorityCity of Whittlesea
- Postcode3752
- The run from EppingOne of the closest to Epping, immediately east of it and in the same council area.
One cycle on from new
The original plan can usually still be found, and it is the right document.
Marking has a service life of roughly two to four years in heavy traffic and longer where it is lighter. In a suburb whose built stock is comparatively recent, that arithmetic produces a particular kind of site: not a neglected car park that nobody has looked at for decades, but a car park marked once from approved plans and never touched since, now at the end of its first cycle.
That is a better position to be in than it sounds, and it is the one genuinely useful thing to know about marking in a newer suburb. The approved plans usually still exist and can usually still be found — with the builder, the owners corporation, the managing agent or the council file. Which means the right document to mark to is available, and nobody has to trace a faded line.
Tracing is the alternative and it is worse than it looks. A faded line is not the original line: it has been patched, re-marked over by someone in a hurry, encroached on by a kerb repair, and worn asymmetrically by traffic turning one way. Setting out from it reproduces every bit of drift that has crept in over the years and bakes it into the next cycle. Setting out from the plan starts again from the dimension that was approved.
The town centre and newer retail precinct add a different kind of site: customer car parks that cannot be closed, staged section by section around trading hours. And because South Morang is one of the closest suburbs to the base and in the same council area, staging a job over several visits is a practical option here rather than an expensive one.
Worth half an hour before anyone quotes
Go and find the approved plan.
Before you ask anyone to quote, go and find the plan
For a car park of this age the approved plan almost certainly still exists. The builder, the owners corporation, the managing agent or the council file will have it. It is worth half an hour of looking, because it is the difference between re-marking the layout that was approved and re-marking somebody’s best guess at it — and if you genuinely cannot find it, say so and we will measure and record the existing layout as we find it, in writing, rather than pretend we know what it was meant to be.
The responsible authority, and one place the plan may be
The City of Whittlesea holds a file on your site.
South Morang sits in the City of Whittlesea, the same responsible authority as Epping, Thomastown and Mill Park, and the council file is one of the places an approved plan for a newer site can usually be found.
As everywhere, re-marking the approved layout is maintenance and needs no permission. Changing the layout or the number of spaces engages Clause 52.06 of the planning scheme, needs plans prepared to the satisfaction of the council, and may require a planning permit. In a newer car park the layout is usually working as designed, so there is rarely a good reason to change it — and the fact that the original dimensions are findable makes it easy to confirm that.
On a new build the order of precedence decides everything, and it is written out on the standards page.
What a newer site usually needs
Three services, pitched at newer stock.
Re-marking existing layouts
A common job in a newer suburb: a first re-mark, set out from the approved plan that still exists rather than traced off the faded line.
New set-out from approved plans
South Morang is still being added to, so some sites still need a first set-out from approved plans on a surface with nothing on it.
Cleaning the surface first
A newer surface is the best chance you get at a long service life, and it is lost if the second cycle of marking goes down over dust and grit.
Request a quotation
Book it against the programme, not against the deadline.
Find the approved plan if you can, send it through, and the re-mark starts from the dimension that was approved rather than from whatever is left on the ground.